Short answer

A proposal kickoff meeting agenda should produce one thing: a list in which every section, resume, form and subconsultant request has one owner and one date. Cover why the firm is pursuing the work, what the RFP requires, who owns what, and how you will follow through. Send the action items the same day.

Free resource

Download the proposal kickoff assignment sheet. The file is a blank CSV that opens in Excel, Google Sheets or Numbers. It has one row per assignment, with columns for the section, the owner, the due date, the status and the reviewer. One example row shows how to fill it in. No account is required.

What is a proposal kickoff meeting for?

A proposal kickoff meeting turns a decision to pursue into named people with dated work. It is the first meeting after the go decision, and its output is an assignment list and a schedule that everyone has heard out loud. It is not a group reading of the RFP.

Getting people into the room is the smaller problem. Mercedez Thompson, a pursuit manager writing in The Zweig Letter in 2023 about moving from small firms to large ones, says: "Attendance at meetings generally improved at large firms, but accountability around deadlines did not." An agenda built for accountability spends most of its minutes on owners and dates.

What should you prepare before the kickoff?

Prepare four things before the kickoff: a compliance outline, a schedule built backward from the due date, a draft assignment for every item and a list of open decisions. Walking in with drafts turns the meeting from finding volunteers into confirming owners.

  • Compliance outline. Every requirement and evaluation criterion mapped to a section, with page limits and forms.
  • Schedule. Draft dates, two review dates, production and delivery, built by the RFP response timeline method.
  • Draft assignments. A proposed owner and date for every section, resume, project sheet, form and subconsultant request.
  • Open decisions. Team gaps, the questions deadline, who signs and how the submission is delivered.

Send the packet ahead. Lohfeld Consulting Group, writing in APMP's Winning the Business in 2023, gives the timing: "A good rule of thumb is 48 hours before the meeting or within 5% of the proposal’s total duration." On a ten-day response the second figure is half a day, so send what you have and hold the meeting anyway.

What does a proposal kickoff meeting agenda cover?

A proposal kickoff meeting agenda covers six items in about 45 minutes, and each item ends with something settled. Print the last column on the agenda, so the room knows when a line is finished.

Agenda item Led by Minutes Settled when
Why we are pursuing Principal 5 Everyone can repeat the client's main concern and our answer
What the RFP requires Coordinator 10 Criteria, limits, forms and delivery method are understood
Team and subconsultants Principal 5 Each outside firm has one person who will call it
Assignments Coordinator 15 Every item has one owner and one date, said out loud
Schedule and reviews Coordinator 5 Reviewers have accepted both review dates
Questions and open decisions Everyone 5 Each question for the client has an owner and a deadline

Three points belong in the room every time. One owner means one name. If the RFP restricts contact with the client, questions go through its named contact only. The person who signs the submission confirms they are available on delivery day.

Subconsultants join for their own items, and their data call goes out the same day.

Agree at the kickoff who watches for amendments, and how often. On federal solicitations the standard instructions to offerors say: "Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s)." One named person checks the portal on set days and tells the team what changed.

How do you run the kickoff and the follow-through?

Run the kickoff as seven steps, four of them outside the meeting. The proposal coordinator owns the list throughout, the principal owns the opening, and the section owners hold the work in step 6.

  1. Draft the outline, schedule and assignments. The coordinator does this alone, from the RFP.
  2. Send the packet two days ahead. People arrive having read it.
  3. Open with why. The principal explains why the firm is pursuing the work.
  4. Give every item one owner and one date. Each owner accepts the date in the room, or offers another.
  5. Send the action items the same day. One message, with each person's items at the top.
  6. Owners write. The work waits here, with the section owners.
  7. Check every item at each status meeting. A late item is chased that day and goes back to step 6.
From kickoff packet to status check. 1. Proposal coordinator: Drafts the outline, schedule and assignments. 2. Proposal coordinator: Sends the packet two days ahead. 3. Principal: Explains why the firm is pursuing the work. 4. Proposal coordinator: Gives every item one owner and one date. 5. Proposal coordinator: Sends the action items the same day. 6. Section owners: Write their sections, resumes and forms (the work waits here). 7. Proposal coordinator: Checks every item at each status meeting. If "Not delivered yet", go back to step 6.
Workflow diagram: From kickoff packet to status check. The amber step is where the work waits on someone else. Select the diagram to enlarge it.

Lohfeld Consulting Group describes the same follow-through: "After the kickoff meeting, the PM sends out action items and follows up to verify that action items are completed before the next proposal status meeting." PM here means proposal manager.

What should the kickoff action items say?

Kickoff action items should put each person's own items first, with a date and a length, and ask for a reply today if a date is not possible. Take a pursuit, the Marlow Water Treatment Upgrade RFP, coordinated by Dana:

Subject: Marlow RFP kickoff: your items and dates

Hi all,

The proposal is due Thursday, Nov 19 at 2 pm. Here is what each of us owns:

Sam Okafor: technical approach narrative, 4 pages, by Wed, Nov 11.
Theo Lindqvist: structural lead resume in the attached template, by Thu, Nov 12.
Mira Castellanos: fee table sign-off, by Fri, Nov 13.
Dana: three project sheets by Thu, Nov 12, and every form.

If a date is not possible, reply today with the date that is. I will check each item at Monday's status meeting.

Thanks,
[Your name]

Three things commonly slip in the days after that message:

What slips Early sign What to do
An item owned by a group Each person assumes another has started Rename it to one person
A section nobody has started Still "not started" two days later Offer a 20-minute interview and draft it yourself
Requirements changed by an addendum The outline no longer matches the RFP Reissue the sheet with the changes marked

For the second row, the guide to getting proposal input from subject matter experts has the wording.

How does Noddis keep kickoff assignments on schedule?

Noddis is a project management app that keeps tasks, follow-ups, and related project details connected. When we built Timeline in Noddis, we drew each task as a bar from its start date to its due date and marked the project's due date with a flag.

A kickoff ends with dates, and Timeline (Pro) shows whether they fit: each assignment is a bar, the reviews sit near the end and the flag is the due date. To start the task list, choose Proposal / Scope in the Import dialog and paste the RFP's requirements. Noddis drafts a task outline, and you review it before anything is created.

Noddis Timeline for an RFP: remaining tasks as bars, with the review and final production placed before the project due flag.
Noddis Timeline for an RFP: remaining tasks as bars, with the review and final production placed before the project due flag. Select the image to view it full size.

At each status meeting, Stages (Pro) shows the same pursuit in columns, so the items still under Not Started are the first thing you see. Log a late item in Follow-Up as a Waiting on Others entry, and it carries its age in days. Follow-Up covers one project on Free and every project on Pro.

Noddis Stages for an engineering firm's proposal team: one pursuit's tasks in columns for not started, in progress and pending, with finished work below.
Noddis Stages for an engineering firm's proposal team: one pursuit's tasks in columns for not started, in progress and pending, with finished work below. Select the image to view it full size.

Writing, layout and assembly of the proposal stay outside Noddis, and it does not connect to Outlook or Teams. The AEC proposal management workflow shows the setup with screenshots.

Your next step

Download the assignment sheet, fill in a proposed owner and date for every item on your next RFP, and send it with the kickoff invitation. To lay your own assignments out as bars against a due date, open the live demo. No account is needed.

Common questions

Who needs to be in the room?

Invite everyone who will own an item: the principal, the proposed project manager, each section owner, the person preparing the fee and whoever produces the final document. Keep pricing and strategy inside your own firm, and bring subconsultants in for their items only.

Should you hold the kickoff before the go or no-go decision?

No. A kickoff assumes the decision is made, and people commit time differently when a pursuit might still be dropped. Decide first, even if that takes a day of the response window. If the answer is no, you have saved every section owner the effort.

What if the principal cannot attend the kickoff?

Move the meeting by a day before you hold it without the principal. The reason for pursuing and the win themes come from that person, and the team writes to them. If no date works, get five minutes by phone beforehand and read the answers out at the start.

Katleen, founder of Noddis

Katleen is the founder of Noddis. She runs client projects through her app studio, 693 Labs, and builds Noddis around the problems that work creates.

Last reviewed . Feature details reflect Noddis at the time of review.